Forstone Capital will save more than $260,000 in energy costs this year.
Facing overwhelming operating costs and no way to address all of their new building’s energy needs at once, Brandon Hall and Brett Wilderman considered pushing projects to the side for years. But, C-PACE let them do everything in one fell swoop. They made comprehensive energy upgrades, improving their investment and increasing their bottom line.
“Energy efficiency is always something we strive for, but due to the size and scope of this particular project, it would not have been possible without C-PACE. The end result will be better comfort for our tenants and a much improved physical asset.”
– Brandon Hall, Principal
Location
Forstone Capital • Bridgeport, CT
Energy Update
VFD, HVAC, Controls, Cooling towers, Energy Management System, Windows, Building Envelope
Total Loan Amount
$2,155,401 • Over 20 years
Projected Energy Savings
$6,156,163 • Over the life of the upgrades